|
IIHR
Archive
Hydraulics
Laboratory and Annexes
The Hydraulics Laboratory is IIHR’s initial and central
structure, and it has played a crucial role in IIHR’s history. Through
the years, it has been remodeled many times to meet IIHR’s changing
needs and research approaches. This record group includes the papers
related to the construction and physical restructuring of the Hydraulics
Laboratory through time. It also includes material on construction of
the ship model towing tank, ice model towing tank, and IIHR’s research
annexes.
The record group consists of six archival boxes.
Box 1.
Estimates, Construction - 1920, 1928, 1932
-
Terrell Mill Brochure
-
Floor Plans – First
Floor, Undated
-
Land Purchase 1920,
1930
-
Estimates
of Building Costs 1920, 1932?
-
Hydraulics Lab Plans
1928
-
Drawings of North
Wing of Hydraulics Laboratory 1928
-
Computations
for Density 1928
-
“Memorandum on
Proposed Hydraulic Laboratory”
(Nagler, unpublished, 1930)
-
Extension
of Foundations / River Canals 1931 (Correspondence, bids)
-
“Specifications of
the General Contract for Substructure…” 1932
Box
2.
Construction, Future Plans 1932 – 1939
-
Floor
Plans and Construction Specifications, Laboratory Extension 1932
-
Bench Mark
Elevations, Indenture of Property 1932
-
Addition
for Offices on South of Existing Laboratory, notes and plans by
Mavis, undated
-
Design
Data & Computations For Design 1932
-
Miscellaneous
Correspondence, Plans 1933
-
General
Floor Plans 1933
-
Construction
and Maintenance 1935
-
Land
Purchase of Boston Property South & West of Hydraulics
Laboratory 1934 – 1935
-
Specifications
for Repairs for Headgate in River Channel, written by Mavis,
Mid-1930s (Correspondence & Sketches)
-
Water
Distribution Systems 1935 – 1936
-
Planned
Extension 1936 (Sketches, Costs, Original Photos)
-
University
Water Supply Line 1936
-
Floor
Plans Used in Various Articles 1936
-
Floor
Plans 1939
Box 3.
Equipment 1928 – 1936
-
10”
Venturi Meter blueprints 1928
-
Hydraulic
Demonstration Table 1930-1936 (Instructions & Blueprints)
-
Sump
Pump 1931 (Blueprints & Correspondence)
-
Assembly
of Sluice Gate and Type “MIO” Stand 1931 (Blueprint,
Correspondence)
-
Sluice
Gates, Venturi Meter, 48” pipeline 1931, 1934 (Blueprints,
Correspondence)
-
Brake
Pulley 1931 (Blueprint)
-
Centrifugal
Pumps 1931-1933 (Bids, Blueprints, Proposals)
-
Flap
Valve 1928, 1931 (Blueprints)
-
Weighing
Tanks 1933 (Blueprints)
-
Slope
Table 1933 (Design, Blueprints, Correspondence)
-
Railing
Along River Flume, Estimates by O.J. Baldwin 1934
-
30”
Flume (wood and glass) constructed 12/1935 for H.D. Davis’ Tests
1935
-
Glass
Flume, USDA & IIHR 1935-1936
(Sketches, Blueprints)
-
Head
Gate, Hoist 1931 (Correspondence & Blueprints)
-
Head
Gate Data / Design 1935 – 1936
-
Hopper
Partitions & Outlets 1936 (Plans & Blueprints)
-
Memorandum
& Specifications for Wiring Pump and Motor in South End
1935-1936 (Blueprints, Correspondence)
-
Stevens
Recorder Operating Instructions Undated
Box 4.
Towing Tank Construction, Mid – 1950s
-
Correspondence,
Bills 1954 – 1955; also paper, “The Iowa Towing Tank” (anon,
unpublished)
-
Loads
on the South Wall 1955 (Computations, Notes, Sketches)
-
Electrical
1955 – 1956
-
Overhead
Trolley 1955 – 1956
-
Steel
1954 – 1955
-
Wire
Rope 1955 – 1956
-
Hydraulic
Drives 1955 – 1957
-
Transmission,
Gears, Etc. 1955 – 1956
-
Cleaning,
Santobrite 1950s
-
Miscellaneous
1955 – 1957 (Includes Photographs)
Box 5.
Ship Towing Tank, Ice Model Towing Tank
1950s-1997
-
Towing
Tank Design Computations, 1950s. Two folders.
-
Towing
Tank Remodeling, LDV, PIV, 1987-1997
-
Ice
Model Towing Tank Design, Construction,
1978-1981. Two folders.
Box 6.
Remodeling Efforts, Construction of Annexes 1980 - 1998
-
Elevator Renovation 1980
-
Construction of Wind Tunnel
1983
-
Stairwell Replacement, Fire Escapes
1986
-
Howe Conference Room
1987
-
Proposed Remodeling, First, Second, Third Floors
1990
-
East Annex Addition 1991
-
Fifth Floor Remodeling
1993-94
-
Ice Lab Refrigeration
1994
-
Electrical Power 1994-95
-
Remodeling Wind Tunnel Annex
1994, 1997
-
Third Floor Remodeling
1995
-
Roof 1995
-
Constructing Oakdale Annex II
1996
-
First Floor Renovation
1997
-
Wind Tunnel Upgrade, Proposed
1998
(processed 6/2002)
Back |