Water Levels and Production

Date
Static Water Level
Yield
Date: 09/23/1996
Static Water Level: 59.00 ft
Yield: 500 gallons per minute
Date
09/23/1996 
Start Time
 
Aquifer
Bedrock 
Static Water Level
59.00 ft
Yield
500 gallons per minute
Pumping Water Level
108 ft
Yield Method
Orifice
Measurement
Airline 
Pump Test
Yes
Pump Method
Pumped 
Duration
2400 mins
Comments