Water Levels and Production
Date
Static Water Level
Yield
Date: 01/07/1994
Static Water Level: 42.00 ft
Yield: 704 gallons per minute
Date
01/07/1994
Start Time
08:00
Aquifer
Unknown
Static Water Level
42.00 ft
Yield
704 gallons per minute
Pumping Water Level
77 ft
Yield Method
Unknown
Measurement
Unknown
Pump Test
Yes
Pump Method
Pumped
Duration
2830 mins
Comments
Date: 03/02/1994
Static Water Level: 42.00 ft
Yield: 525 gallons per minute
Date
03/02/1994
Start Time
09:31
Aquifer
Unknown
Static Water Level
42.00 ft
Yield
525 gallons per minute
Pumping Water Level
76 ft
Yield Method
Unknown
Measurement
Estimate
Pump Test
Yes
Pump Method
Pumped
Duration
2400 mins
Comments
Date: 08/10/2015
Static Water Level: 53.00 ft
Yield: 785 gallons per minute
Date
08/10/2015
Start Time
Aquifer
Static Water Level
53.00 ft
Yield
785 gallons per minute
Pumping Water Level
88 ft
Yield Method
Unknown
Measurement
Unknown
Pump Test
No
Pump Method
Unknown
Duration
360 mins
Comments
Reported on 2015 DNR Dakota survey.