Water Levels and Production

Date
Static Water Level
Yield
Date: 04/01/1994
Static Water Level: 13.00 ft
Yield: 1453 gallons per minute
Date
04/01/1994 
Start Time
 
Aquifer
Unknown 
Static Water Level
13.00 ft
Yield
1453 gallons per minute
Pumping Water Level
33 ft
Yield Method
Unknown
Measurement
Unknown 
Pump Test
Yes
Pump Method
Unknown 
Duration
0 mins
Comments
Date: 07/01/1994
Static Water Level: 10.00 ft
Yield: 1050 gallons per minute
Date
07/01/1994 
Start Time
 
Aquifer
Unknown 
Static Water Level
10.00 ft
Yield
1050 gallons per minute
Pumping Water Level
21 ft
Yield Method
Unknown
Measurement
Unknown 
Pump Test
Yes
Pump Method
Unknown 
Duration
0 mins
Comments
Date: 03/01/1995
Static Water Level: 11.00 ft
Yield: 1100 gallons per minute
Date
03/01/1995 
Start Time
 
Aquifer
Unknown 
Static Water Level
11.00 ft
Yield
1100 gallons per minute
Pumping Water Level
28 ft
Yield Method
Unknown
Measurement
Unknown 
Pump Test
Yes
Pump Method
Unknown 
Duration
0 mins
Comments
Date: 06/01/1995
Static Water Level: 10.00 ft
Yield: 1100 gallons per minute
Date
06/01/1995 
Start Time
 
Aquifer
Unknown 
Static Water Level
10.00 ft
Yield
1100 gallons per minute
Pumping Water Level
23 ft
Yield Method
Unknown
Measurement
Unknown 
Pump Test
Yes
Pump Method
Unknown 
Duration
0 mins
Comments
Date: 10/01/1995
Static Water Level: 13.00 ft
Yield: 800 gallons per minute
Date
10/01/1995 
Start Time
 
Aquifer
Unknown 
Static Water Level
13.00 ft
Yield
800 gallons per minute
Pumping Water Level
26 ft
Yield Method
Unknown
Measurement
Unknown 
Pump Test
Yes
Pump Method
Unknown 
Duration
0 mins
Comments