Water Levels and Production

Date
Static Water Level
Yield
Date: 03/10/2006
Static Water Level: 9.00 ft
Yield: 850 gallons per minute
Date
03/10/2006 
Start Time
09:55 
Aquifer
Alluvium 
Static Water Level
9.00 ft
Yield
850 gallons per minute
Pumping Water Level
27 ft
Yield Method
Orifice
Measurement
Electric Line 
Pump Test
Yes
Pump Method
Bailed 
Duration
400 mins
Comments