Water Levels and Production

 

Date
Static Water Level
Yield
Date: 02/23/2007
Static Water Level: 110.00 ft
Yield: 60 gallons per minute
Date
02/23/2007 
Start Time
 
Aquifer
Silurian/Devonian 
Static Water Level
110.00 ft
Yield
60 gallons per minute
Pumping Water Level
147 ft
Yield Method
Estimate
Measurement
Airline 
Pump Test
No
Pump Method
Pumped 
Duration
720 mins
Comments
Rob Brown said well recovered in 40 minutes. All pumping info from telephone conversation with Rob Brown on 04/28/2010.